Small Manufacturers Reduce Material Resource Planning Implementation Cycle to 18 Days

Written by Rocky Smolin


Continued from page 1

Also included is a physical inventory function, a purchase order module for printing purchase orders and a capacity planning module which reports work center loading and activity based onrepparttar user’s cost labor routings. Priced at $2995,repparttar 102913 E-Z-MRP system is a fraction ofrepparttar 102914 cost of systems with similar power and capabilities. It will run on any Windows-based PC or network, and requires only Access 2000 or Access XP to run. No on-site or remote training is required. A comprehensive user manual with tutorials provides allrepparttar 102915 required instruction.

For more information, and user testimonials, visitrepparttar 102916 company’s web site: http://www.e-z-mrp.com, or call 858-259-4334.

### Rocky Smolin Beach Access Software 858-259-4334

None


ETO ERP Encompix has ENERFAB Live in 3 Months

Written by Roger Meloy


Continued from page 1

Thomas R. Cutler, spokesperson forrepparttar ETO Institute (www.etoinstitute.org) said, “The ETO Institute recognizes Encompix asrepparttar 102912 clear cut leader inrepparttar 102913 Engineer-to-Order environment. The ability to trackrepparttar 102914 rework is so central torepparttar 102915 ETO process that it is a central quality issue.”

Encompix (www.encompix.com) has filledrepparttar 102916 manufacturing software requirements of Engineer-to-Order companies since 1992. The company name reflects our commitment to developing business application solutions that encompassrepparttar 102917 complex areas of project-based and job-based manufacturing.

Encompix provides ETO manufacturers with a competitive advantage by improving bottom line results.

Contact: Roger Meloy Encompix 513-733-0066 e-mail protected from spam bots

###

None


    <Back to Page 1
 
ImproveHomeLife.com © 2005
Terms of Use